WW/OCEANFREIG
Wärtsilä locks in five-year service deal for two new TMS Cardiff Gas LNG carriers
Wärtsilä has signed a five-year service deal covering new 174,000 cbm LNG carriers Al Thurayya and Al Majhoulah, booked in Q3 2026 as TMS Cardiff Gas expands its gas fleet.
- Desk
- Ocean Freight
- By
- Tom Whitfield
- Filed
- Length
- 447 words
- Read
- 2 min
Key points05
- Wärtsilä signed a five-year service agreement with TMS Cardiff Gas, booked in Q3 2026.
- The deal covers two newly delivered 174,000 cbm LNG carriers, Al Thurayya and Al Majhoulah.
- Each vessel has two WinGD 5X72DF main engines and four Wärtsilä 34DF auxiliary engines.
- A separate 2025 agreement covers seven other LNG carriers in the TMS Cardiff Gas fleet.
- TMS manages more than 140 vessels across LNG, LPG, tanker, dry bulk and container sectors.
Wärtsilä has booked a five-year service agreement covering two newly delivered 174,000 cbm LNG carriers operated by Greek owner TMS Cardiff Gas, as the company pushes deeper into condition-based servicing for gas tonnage.
The contract, booked in the third quarter of 2026, covers the recently delivered newbuilds Al Thurayya and Al Majhoulah, both of which have now entered service as part of a wider fleet expansion programme at the Athens-based operator.
For Wärtsilä, the deal extends a relationship that already spans much of the TMS Cardiff Gas gas fleet. In 2025, the two companies renewed a separate service agreement covering seven LNG carriers.
What does the agreement include?
The package is built around planned and predictive maintenance aimed at improving vessel availability and operational reliability. Specifically, it covers:
- Dynamic Maintenance Planning, which adjusts maintenance schedules and intervals to actual operating conditions
- 24/7 remote operational support
- Contract management services
- Expert Insight, Wärtsilä's predictive maintenance solution that uses real-time operational data to flag potential equipment issues before they escalate
The propulsion and power setup on each vessel ties the operator closely to Wärtsilä's technology stack: two WinGD 5X72DF two-stroke dual-fuel main engines, four Wärtsilä 34DF auxiliary engines and Wärtsilä gas valve units.
Why reliability matters to the operator
Alexandros Politis-Kalenteris, Deputy COO of TMS Cardiff Gas, framed the deal against the backdrop of tightening LNG trade flows.
"There is increasing global demand for LNG, and carrier operators place a high value on reliability. This is why this agreement with Wärtsilä is important to us," he said.
He added: "The existing agreement covering other vessels in our fleet has delivered a successful combination of technology, high-quality spare parts support and expert services, helping us maintain reliable and efficient operations."
Commercial context
For an operator managing more than 140 vessels across the LNG, LPG, oil tanker, dry bulk and container segments, unscheduled downtime on a 174,000 cbm carrier carries direct charter-party consequences. LNG operators contracting long-term maintenance with engine OEMs signals where the sector's priorities lie: uptime on high-value gas tonnage increasingly depends on data-driven servicing rather than fixed survey intervals.
For Wärtsilä, the agreement deepens its recurring service revenue tied to the dual-fuel newbuild wave, anchoring maintenance income to vessels over their early operating years rather than one-off equipment sales.
With both newbuilds already in service and the prior seven-vessel agreement running in parallel, TMS Cardiff Gas has now tied the majority of its LNG fleet maintenance to a single OEM service framework — a structure the operator says it intends to keep delivering reliability as LNG tonnage demand grows.
Source: Container News
More from Tom Whitfield
Show full bio
Market editor covering consumer brands and retail at Waybill Wire.
146 articles
Related05
Zodiac enters LNG carrier sector with $500m Hanwha order
HGK Splits Operations Into Two Divisions in Rhine Corridor Push
Yangzijiang Maritime stacks up six LR2s at Haifeng in tanker spree
APM Terminals chief: ports must sweat assets, not just buy cranes
Xeneta Rolls Out Weekly Ocean Container Market Update