WW/PROCUREMEN
Shippers warned: cheap transport contracts offer little protection
Shippers relying on cheap transport contracts have little real protection when costs rise or capacity tightens, Scala's Chris Clowes warns — supplier count is a false measure of resilience.
- By
- Elena Vasquez
- Filed
- Length
- 693 words
- Read
- 3 min

Key points
- Chris Clowes, executive director of Scala, says shippers awarding transport contracts primarily on price risk undermining supply chain resilience.
- Clowes argues two providers on one lane offer no resilience if both bid at unsustainably low rates.
- Co-located suppliers can fail together under a single regional disruption, such as a prolonged drought.
- Smaller forwarders can differentiate on agility, local knowledge and flexibility, which Clowes says has real commercial value.
Shippers that award transport contracts primarily on price risk building supply chains with far less protection than their procurement spreadsheets suggest, according to Scala executive director Chris Clowes. The consultancy warns that logistics operators are offering increasingly little cover when costs rise or capacity tightens on lanes shippers believed were backed by contingency arrangements.
The core problem, Clowes told The Loadstar, is that diversification of suppliers can create a false sense of security when those providers won the business by bidding at unsustainably low rates. The cheap contract, not the disruption itself, becomes the point of failure.
"Having two transport providers on a particular lane may look like sensible contingency planning, but if both have won business by bidding at unsustainably low rates in a procurement exercise, how resilient is the arrangement?" Clowes said.
He posed the follow-on question directly: "What happens when costs increase, or capacity becomes constrained? Logistics decision-makers should consider the commercial sustainability of suppliers, as well as their operational capability."
What is wrong with the traditional procurement approach?
The criticism lands on a well-established practice. For years, shippers have judged resilience by the number of transport suppliers they hold on a given lane, and awarded volumes through competitive tenders that drive rates down. Clowes argues that metric measures the wrong thing. Two carriers on one route mean little if the same commercial fragility sits behind both contracts, or if the same disruption hits both at once.
Rather than counting suppliers, shippers should assess how genuinely independent and commercially viable their alternative arrangements are. Procurement decisions, he said, need to account for the financial sustainability of logistics providers alongside their operational capabilities.
The issue reflects a wider flaw in how companies approach supply chain resilience, according to Clowes. Companies tend to concentrate on individual risks, one disruption at a time, rather than examining the dependencies that could quietly undermine their contingency plans.
"Having two suppliers isn't necessarily a resilient solution if they are both in the same location and that region experiences a prolonged drought, because while you have diversified your suppliers, you have not addressed the underlying risk," he explained.
How should shippers define resilience instead?
Clowes set out a three-part test, delivered in a single definition: "Resilience means understanding where the real risks and dependencies sit, testing whether contingency arrangements are genuinely independent, and ensuring that alternative arrangements are commercially and operationally viable."
Each element carries a commercial consequence. A dependency map shows where a single regional event — a drought, a port closure, a capacity crunch — runs through every supposed backup at once. Independence testing exposes suppliers that share infrastructure, geography or cost structures. Viability testing asks whether the backup provider can actually afford to serve the lane when rates move against it.
Despite increased awareness of supply chain risk in recent years, Clowes said he remains concerned that too many companies continue to respond to disruption only as it happens, rather than stress-testing whether their supply chains can withstand different scenarios in advance. Scenario testing, in his framing, is the discipline that separates genuine resilience from paperwork resilience.
Where do smaller forwarders fit in?
The warning cuts in a different direction for the forwarding sector. If smaller forwarders can secure the resilience of their own business model, Clowes sees an opening to differentiate themselves against larger competitors on reliability rather than scale.
"Smaller operators can often be more agile and responsive than larger organisations – particularly where they have strong local knowledge and established relationships," he said.
"That flexibility has real commercial value," he added, pointing to flexible service built on strong customer relationships as the differentiator.
The argument suggests a rebalancing of leverage in the shipper-forwarder relationship. Shippers that have pushed rates to commercially unsustainable levels may find, when the next cost shock or capacity squeeze arrives, that the cheap second provider is no more able — or willing — to keep freight moving than the cheap first. As procurement teams begin pricing supplier viability alongside supplier rates, forwarders that can prove both operational strength and financial staying power are positioned to win business that pure price competition has long directed elsewhere.
Source: The Loadstar
Filed underTransport ProcurementSupply Chain ResilienceSupplier DiversificationFreight ContractsCarrier Viability
More from Elena Vasquez
Show full bio
News editor covering people, launches and day-to-day practice in Ocean and air freight, container shipping at Waybill Wire.
1,010 articles