WW/TRUCKINGRA
Rail-bound imports dwell 7.19 days as US ports face drayage strain
Rail-bound imports averaged 7.19 days at Los Angeles and Long Beach in September, while Savannah, Houston and Virginia face chassis, congestion and terminal-access pressure.
- Desk
- Trucking & Rail
- By
- Elena Vasquez
- Filed
- Length
- 769 words
- Read
- 4 min

Key points05
- Los Angeles and Long Beach rail-bound imports averaged 7.19 days in September, versus 3.18 days for truck-bound imports.
- Virginia terminal restrictions since October 13 set a 3 p.m. PRO-PASS cutoff, a 3:30 p.m. final refrigerated pickup and a 4 p.m. portal closure.
- Savannah’s longer chassis circulation cycles are contributing to higher private chassis costs, while long hauls and congestion affect Houston drayage.
- Overlapping Suez and Cape of Good Hope arrivals could temporarily pressure European terminals and inland networks.
- C.H. Robinson expects infrastructure and equipment constraints to persist through the final months of 2026.
By Elena Vasquez
Rail-bound import containers at Los Angeles and Long Beach spent an average of 7.19 days at marine terminals in September, according to Pacific Merchant Shipping Association figures cited by C.H. Robinson. Truck-bound imports spent 3.18 days, so rail-bound cargo remained 4.01 days, or 2.26 times as long.
C.H. Robinson links limited railcar availability to those delays, which increase pressure on terminal space and inland delivery schedules. The constraint can persist even when vessel operations run relatively smoothly, leaving the ocean-to-inland handoff as the decisive bottleneck.
At a time when import demand is moderating, C.H. Robinson’s November 2026 Edge Report warns that lower volumes may not clear the inland network. “Lower import volumes may not immediately improve inland transportation capacity,” the company said. Uneven vessel arrivals and longer container dwell times can raise demand simultaneously for trucks, equipment and terminal appointments.
Why does softer demand not clear inland bottlenecks?
Smooth vessel handling does not guarantee a smooth inland handoff. Carriers can face a discharged container without a railcar, chassis or pickup appointment, while shippers see cargo at the terminal but no firm delivery slot. C.H. Robinson’s warning shifts attention from ocean arrivals alone to the capacity required to move boxes inland.
For forwarders, that means an ocean schedule can no longer serve as the sole planning assumption. Rail connections, terminal access and equipment availability determine when a container can leave the port, potentially extending the time between vessel discharge and warehouse delivery. Shippers face missed appointments, storage and transportation costs when those links fail.
At Southern California gateways, limited railcar availability has contributed to delays and pressure on terminal space and inland schedules. The 7.19-day rail dwell versus 3.18 days for trucks shows why easier truck access at one port can still coexist with congestion across the rail-linked inland network.
Savannah faces a different equipment equation. C.H. Robinson says containers remaining in circulation for longer periods reduce the number of times each chassis can be used. That extended equipment cycle contributes to higher private chassis costs while chassis availability remains constrained for carriers and shippers.
Houston’s pressure comes from strong industrial demand, longer inland transportation distances and road congestion. C.H. Robinson says these conditions affect both drayage costs and equipment availability. They could also limit the seasonal relief normally expected as import demand slows, leaving the gateway without a full reprieve.
How are Virginia’s terminal gates changing?
Since October 13, inbound truck gates at Norfolk International Terminals and Virginia International Gateway have operated under shorter access windows at the Port of Virginia. Portals now close at 4 p.m., mandatory PRO-PASS reservation hours end at 3 p.m., and the final refrigerated container pickup is scheduled for 3:30 p.m.
The schedule places the final refrigerated pickup 30 minutes after mandatory PRO-PASS reservations end, while portals remain open for another 30 minutes. C.H. Robinson says the shorter windows reduce trucking companies’ flexibility, especially when cargo releases occur late or terminal queues delay a driver.
A missed collection can carry through the rest of the container movement. Late cargo releases or terminal queues may prevent drivers from completing additional pickups during the same working day, which can affect warehouse appointments, chassis positioning and empty-container returns. Those knock-on effects can add storage and transportation costs.
What does the Suez return mean for Europe?
Outside North America, C.H. Robinson is tracking the gradual return of container services through the Suez Canal. Shorter routes may improve vessel circulation, but the report warns that overlapping arrivals from Suez and Cape of Good Hope services could temporarily increase pressure on European terminals and inland networks.
The near-term risk is schedule bunching rather than a simple increase in route options. If sailings from both routings reach Europe close together, terminal and inland capacity can tighten during the transition. The reopening can improve circulation without immediately removing equipment and infrastructure constraints.
C.H. Robinson expects local infrastructure and equipment constraints to remain important through the final months of 2026. The report advises shippers to weigh “terminal access, chassis availability and inland delivery conditions alongside ocean freight schedules” when planning shipments, rather than treating vessel arrival as the end of the logistics chain.
Through the final months of 2026, capacity rather than softer demand alone is likely to set the pace of US container deliveries. Terminal access, chassis supply and inland execution will determine whether an ocean schedule translates into an on-time warehouse delivery.
Original: chrobinson.com
More from Elena Vasquez
Show full bio
News editor covering people, launches and day-to-day practice in Ocean and air freight, container shipping at Waybill Wire.
929 articles
Related05
Nearly 35,700 containers stuck waiting for trains at LA–Long Beach
Container Dwell Times Climb at Los Angeles and Long Beach
US container gateways see no post-peak easing as drayage stays tight
Container Rates Extend Six-Week Climb on Americas Demand
Trans-Pacific peak season stretches as Asia delays meet strong US imports