WW/TRUCKINGRA
Intramotev Wins $16.2M Federal Grant for Autonomous Railcars on Missouri Short Line
A $16.2M FRA grant puts two Intramotev TugVolt autonomous railcars on Columbia, Missouri's 21.4-mile COLT short line, aiming to build a safety template for 600+ US short lines.
- Desk
- Trucking & Rail
- By
- Marcus Bennett
- Filed
- Length
- 606 words
- Read
- 3 min

Key points05
- The FRA awarded a $16.2 million CRISI grant to the City of Columbia for autonomous railcar deployment.
- Two Intramotev TugVolt autonomous railcars will run on COLT's 21.4-mile line between Centralia and Columbia, Missouri.
- Deployment phases begin with remote switching at the Columbia terminal before autonomous full-line service including public crossings.
- The project aims to create a safety template for the more than 600 U.S. short-line railroads.
- Intramotev also signed Austria's OBB Rail Cargo Group in April and hosted U.S. Army Reserve training on TugVolt in June.
A $16.2 million federal grant will put two autonomous freight railcars to work on a 21.4-mile Missouri short line, in what backers bill as the first working test of driverless rail technology on a municipally owned mainline with public crossings.
The Federal Railroad Administration selected the City of Columbia for the award under its Consolidated Rail Infrastructure and Safety Improvements (CRISI) program. St. Louis-based Intramotev will serve as the technology partner, deploying its TugVolt self-propelled railcar technology on the Columbia Terminal Railroad, known as COLT, which runs between Centralia and Columbia.
COLT is owned by the city and operated by Columbia City Utilities. Intramotev will build both TugVolt units at its St. Louis facility.
How will the deployment unfold?
Operations will proceed in phases under an FRA-approved test program, according to the announcement. The project begins with remote switching at COLT's Columbia terminal, then advances to autonomous freight service across the full mainline, including its public grade crossings. The grant also funds track and infrastructure upgrades along the line.
That staged approach is standard for new rail technology, but the announcement did not specify a deployment date or a timetable for moving from terminal switching to full-line autonomous service. Absent a schedule, the practical question for shippers on the line — when autonomous service actually starts carrying their freight — remains open.
The project's stated purpose goes beyond one railroad. It is intended to produce a safety record that the FRA and the more than 600 short-line railroads across the United States can use as a template for adopting autonomous railcars. If the COLT demonstration holds up, it could give hundreds of small carriers a documented path to the technology rather than a one-off experiment.
What are operators saying?
Tim Luchini, Intramotev's chief executive, framed the economics for short lines directly.
"Short lines keep America's small cities and rural communities connected to the freight network," Luchini said. "Autonomous railcars can help them serve more customers, more often, at lower cost, and this program will show what that looks like on a working mainline."
Erin Keys, Columbia's utilities director, tied the investment to the railroad's four-decade role in the local economy.
"COLT has been Columbia's link to the national rail network for nearly 40 years, and the businesses that depend on it support hundreds of local jobs," Keys said. "This federal investment lets us modernize the railroad, strengthen service for our customers, and put Columbia at the forefront of rail innovation."
A building commercial track record
The award caps a year of momentum for Intramotev. In April, the company announced an agreement with Austria's OBB Rail Cargo Group, extending its reach into the European market. In June, U.S. Army Reserve soldiers trained on TugVolt technology during a planned technology assessment, adding a defense dimension to the company's references.
For short-line operators, the commercial pitch is straightforward: TugVolt units move railcars without a dedicated locomotive, which could cut the cost of serving low-volume customers and increase service frequency on branches where conventional train economics fail. The COLT project is the test of whether that promise survives contact with a working mainline and its public crossings.
The caveat is timeline. Neither Intramotev nor the city committed to dates for the switch from remote terminal operations to autonomous mainline service, and the safety record the project is meant to generate will take time to accumulate. Watch for the first phase — remote switching at the Columbia terminal — as the earliest signal of whether the $16.2 million bet stays on schedule.
Original: getfreightdata.com
More from Marcus Bennett
Show full bio
Senior reporter covering regulation, policy and their impact on Ocean and air freight, container shipping at Waybill Wire.
638 articles