WW/PORTSTERMI

Filed 639W3M read

Dangote and Afreximbank sign on for Sierra Leone's $6.1bn Banana Island port

Gento, Dangote and Afreximbank signed an MoU in Lungi for a $6.1bn Banana Island port and Tonkolili rail link — with no disclosed financing, roles or construction date.

By
Marcus Bennett
Filed
Length
639 words
Read
3 min
Sierra Leone’s 22-metre Banana Island port gains Dangote and Afreximbank as partners, with a rail link planned to mining
Sierra Leone’s 22-metre Banana Island port gains Dangote and Afreximbank as partners, with a rail link planned to miningPaul Macdonald / unsplash

Key points05

  • Gento, Dangote and Afreximbank signed an MoU on 17 November at the West Africa Integration and Investment Summit in Lungi.
  • Sponsor's estimate for the port-and-rail programme is about $6.1 billion; a Gento October update split it into a $2.7bn port and $3.2bn railway.
  • Sierra Leone's Parliament ratified a Gento concession in July 2024 for a Banana Island seaport and Kent terminal, with a 10% government share.
  • The planned port would have a depth of about 22 metres and a rail link to Tonkolili's mining region.
  • Guinea is separately pursuing a $1.9 billion deep-water port tied to the Simandou iron-ore development.

Sierra Leone's Banana Island deep-water port project now carries a headline number of about $6.1 billion — but the memorandum of understanding signed on November 17 discloses not a single dollar of committed financing.

Gento Group, Nigeria's Dangote and the African Export-Import Bank signed the MoU at the West Africa Integration and Investment Summit in Lungi. The close-out statement, circulated by Sierra Leone's State House Media and Communications Unit, put the sponsor's estimate for the combined port-and-rail programme at about $6.1 billion. That figure has already moved once: a Gento project update in October split the programme into a $2.7 billion port and a $3.2 billion railway, or $5.9 billion combined.

The gap between the two numbers — roughly $200 million in three weeks — is one measure of how early this project remains.

What does the agreement actually commit?

By the sponsor's own framing, very little. The MoU advances the project's development, but it does not disclose how much any party will invest, what specific roles each will take, or when construction would begin.

The project itself is further along on paper than the new MoU suggests. Sierra Leone's Parliament ratified a concession agreement with Gento in July 2024 covering the design, financing, construction and operation of a seaport at Banana Island and a terminal at Kent. At that time, the transport minister estimated the port alone at about $2 billion and said the government would hold a 10% share.

A 10% government stake in a $6.1 billion programme represents a state interest worth roughly $600 million — on paper. Whether that share survives the addition of two heavyweight partners, and on what terms, is one of the questions the MoU leaves unanswered.

Dangote's involvement signals industrial intent: the group moves bulk volumes of clinker, cement and raw materials across West Africa and has a clear commercial interest in cheaper, deeper port access. Afreximbank, for its part, has financed port and trade infrastructure across the continent. Neither party has stated a figure.

A 22-metre draft aimed at mining cargo

Gento says the planned port would offer a depth of about 22 metres — deep enough to berth the largest bulk carriers afloat — and would accommodate larger vessels than any current Sierra Leonean facility can take. The rail component would connect the coast to mineral-producing regions, including Tonkolili, the iron-ore belt that has drawn repeated but repeatedly stalled investment over the past decade.

The technical groundwork has at least been done by an outside party. Maritime & Transport Business Solutions, a Dutch port consultancy, completed a feasibility assessment for Gento between May and October 2024, covering market, traffic and financial analysis. A feasibility study, it should be noted, is an input to a final investment decision — not a substitute for one.

Regional race for mineral corridors

The project arrives as West African states compete to build the infrastructure that moves minerals to international markets. Guinea is separately pursuing a $1.9 billion deep-water port designed to serve miners, container traffic and industry alongside the Simandou iron-ore development. Reuters reported that Guinea is courting US, Chinese and multilateral financiers.

The comparison sharpens the caveat. Guinea's smaller port project has an identifiable financing search under way; Sierra Leone's larger one has an MoU without a disclosed financing commitment.

For shippers, miners and forwarders watching the Mano River region, the significance is prospective rather than immediate. A 22-metre-draft port with a Tonkolili rail link would redraw bulk export economics for Sierra Leone's iron-ore and bauxite trades, and could pull transshipment traffic currently routed through Conakry or Abidjan. None of that happens until capital is committed and construction starts — two milestones the November 17 signing conspicuously did not set.

Source: africa.businessinsider.com

Share this article:

More from Marcus Bennett

Marcus Bennett

Show full bio

Senior reporter covering regulation, policy and their impact on Ocean and air freight, container shipping at Waybill Wire.

1,006 articles

Related05

  1. Sierra Leone launches SLOSCO with Chinese partner and 50-ship ambition

  2. Guinea seeks $1.9bn for 20-metre-draft deep-water port

  3. Sierra Leone launches Chinese-backed carrier with 50-ship fleet plan

  4. DP World signs MOUs for 10,000-hectare port and SEZ in Ogun State

  5. 1,350 km CAR–Kribi Rail Could Add 70-80 Capesizes a Year

« PrevNext »