WW/TRUCKINGRA

Filed 592W3M read

90mph trial freight trains halve Midlands-Glasgow rail transit time

GoExpress's 90mph trial trains on the West Coast Mainline cut Midlands-Glasgow freight transit from nine hours to 4.5, running 54 test services for DPD UK with DfT funding.

By
Elena Vasquez
Filed
Length
592 words
Read
3 min
Rail freight trial slashes transport times
Rail freight trial slashes transport timesNick Sorockin / unsplash

Key points

  • 315-mile Midlands-Glasgow rail journey cut from 9 hours to 4.5 hours in a four-week trial
  • 40ft high-cube containers ran at up to 90mph, versus the 75mph limit for conventional freight
  • 54 test trains ran on dedicated WCML paths; annualised service would remove 3,120 M6 HGV movements
  • DPD UK was the trial customer, using hubs at Hinckley and Mossend Euroterminal
  • Trial backed by DfT's Freight Innovation Fund via Connected Places Catapult

A four-week trial on the West Coast Mainline has halved rail freight transit times between the Midlands and Glasgow, cutting the 315-mile journey from nine hours to four hours and thirty minutes. The results arrive as hard evidence for a mode-shift argument that UK rail freight has struggled to make with comparable data.

The proof-of-concept operation, run by logistics operator GoExpress, moved 40ft high-cube intermodal containers at speeds of up to 90mph — a 20% lift over the 75mph ceiling that constrains conventional container trains. GoExpress ran 54 test trains over the four weeks on dedicated high-speed paths supplied by Network Rail, with funding from the Department for Transport's Freight Innovation Fund programme, delivered by Connected Places Catapult.

Who ran it, and for whom?

The paying customer behind the trial was parcel carrier DPD UK, which operates hub infrastructure at both ends of the route: Hinckley in Leicestershire and Mossend Euroterminal in North Lanarkshire. That pairing matters for the economics. A 4.5-hour rail leg between two parcel hubs turns the train into a credible substitute for premium road linehaul on the Anglo-Scottish corridor, not just for bulk or intermodal volumes tolerant of overnight scheduling.

The partner roster also included the Rail Safety and Standards Board, Network Rail, Freightliner, the Rail Operations Group, and Birmingham and Huddersfield universities.

What does faster freight change?

The commercial logic hinges on path density and truck displacement. At trial frequencies sustained across a year, GoExpress calculates the service would remove 3,120 HGV movements from the M6 — the motorway that carries the road equivalent of this corridor. Faster services also free capacity on the WCML itself, with the trial supporting one additional train path every hour on the route.

For shippers and forwarders, the arithmetic translates directly: a rail product that competes on time with road between English Midlands distribution centres and central Scotland widens the addressable market for rail beyond deep-sea port hinterlands into domestic express and middle-mile networks. For carriers, extra hourly paths on the UK's busiest mixed-traffic railway represent scarce sellable capacity.

Anit Chandarana, systems operator at Network Rail, framed the stakes in policy terms. "These results give policymakers, infrastructure managers and customers the evidence they need to back high-speed logistics as a serious lever for both decarbonisation and growth," he said.

Booking and tracking built in

GoExpress has built a digital platform alongside the physical service, covering simplified slot booking and real-time container tracking across both road and rail legs. For integrators like DPD, visibility across mode boundaries has historically been the friction point in mixed road-rail middle-mile operations; the tracking layer addresses that gap directly.

Can high-speed rail rewrite the middle mile?

Adam Parkinson, chief executive of GoExpress, positioned the trial as breaking a standing trilemma in express logistics. "Express logistics has always existed with a hard trade-off on the middle mile: speed, cost, or carbon," he said. "Our trial shows us that operators can rapidly optimise their middle-mile networks through the introduction of high-speed rail."

The 90mph operation still requires network-level commitment to become service reality: dedicated fast paths on the WCML must be protected in timetable planning, and Network Rail's role as path provider signals institutional buy-in at the trial stage. If regular services follow, the 3,120-truck annual figure and the hourly added path give both DfT and private operators a quantified basis for investment decisions on the corridor through 2027 and beyond.

Original: intralogistex.co.uk

More from Elena Vasquez

Elena Vasquez

Show full bio

News editor covering people, launches and day-to-day practice in Ocean and air freight, container shipping at Waybill Wire.

1,010 articles

Related

  1. Liverpool port rail share stuck at 2% as Peel Ports expands terminal

  2. Padrock signs two 10-year leases at £75m Hertford Logistics Hub

  3. DP World's Southampton rail scheme cuts 50,000 tonnes of CO₂e

  4. DRS-Tesco rail partnership marks 20 years with 10 daily UK services

  5. DPD opens seven depots, adds 720+ electric vans ahead of peak 2026

« PrevNext »