WW/OCEANFREIG

Filed 552W3M read

MSC Meline drops Genoa call; cargo rerouted via Livorno

MSC Meline skips its 27 October Genoa call on the MSE service; imports shift to Livorno for a 30 October connection, while exports await rebooking.

By
Elena Vasquez
Filed
Length
552 words
Read
3 min
MSC Meline to omit Genoa call on MSE service
MSC Meline to omit Genoa call on MSE servicePexels / pixabay

Key points05

  • MSC Meline, voyage MM643A, omits its scheduled Genoa call of 27 October 2026
  • Omission attributed by Hapag-Lloyd to a schedule recovery measure on the MSE service
  • Genoa import cargo discharges instead at Livorno, connecting with MSC Albany (MM644A) on 30 October 2026
  • Genoa export cargo moves on first available vessels, with routing chosen on updated schedules and transit times
  • Affected customers receive revised booking confirmations and must update shipping documentation

MSC Meline, voyage MM643A, will skip its scheduled call at Genoa on 27 October 2026, forcing Hapag-Lloyd to reroute Italian import and export cargo through neighbouring ports on the Mediterranean–South America East Coast (MSE) service. The carrier attributed the omission to a schedule recovery measure, the routine but commercially disruptive step carriers take when a loop falls behind its published rotation.

For shippers with cargo booked on the vessel, the practical consequences are immediate. Import freight originally slated for discharge in Genoa will instead come off the ship in Livorno, roughly 150 kilometres up the Ligurian coast.

How will affected cargo actually move?

Hapag-Lloyd has set out a two-track arrangement for the disrupted cargo. Import boxes discharged at Livorno will connect with MSC Albany, voyage MM644A, which is scheduled to call at the Tuscan port on 30 October 2026 — three days after the cancelled Genoa call.

Export cargo from Genoa faces a less precise path. Hapag-Lloyd said it will move Genoa export bookings onto the first available vessels, selecting routing based on updated schedules and transit times. That leaves export shippers without a confirmed loading vessel until the carrier finalises its recovery plan.

The carrier has committed to issuing revised booking confirmations with details of the new loading vessel for every affected customer. It has also asked shippers to update their shipping documentation to reflect the changes — a non-trivial task for exporters whose letters of credit, bills of lading and customs paperwork reference the original vessel and port rotation.

What does a schedule recovery omission mean for shippers?

A port omission is the blunt instrument carriers use when a vessel has slipped so far behind that skipping a call is the only way to restore the rotation. One missed call can save a day or more of port time and transit, protecting the integrity of subsequent voyages but pushing the cost of the delay onto the cargo booked at the omitted port.

For importers on this MSE rotation, the price is modest in this case: a discharge shift from Genoa to Livorno and a three-day wait for the onward connection aboard MSC Albany. Inland haulage from Livorno rather than Genoa may add cost and time for cargo destined for northern Italian distribution points, depending on the terms of the booking.

Exporters face greater uncertainty, because the first-available-vessel instruction gives no firm date, port or transit time until revised confirmations land. Forwarders managing Genoa-origin bookings on the South America East Coast trade will need to check documentation, renegotiate haulage and alert consignees to revised arrival windows.

The interruption comes on a trade lane that links Mediterranean base ports with Brazil, Argentina and Uruguay, serving Italian exporters of machinery and chemicals and importers of South American agricultural commodities. Any slippage on the loop has knock-on effects for the return voyages, which is precisely why carriers act quickly to recover schedules rather than let delays compound across weeks.

For now, the disruption is contained to a single voyage on a single service, with a defined recovery connection already in place. Shippers with cargo on MM643A should expect revised booking confirmations shortly and prepare documentation updates; whether the MSE rotation holds its schedule after the 30 October Livorno call will determine if further omissions follow.

Source: Container News

Share this article:

More from Elena Vasquez

Elena Vasquez

Show full bio

News editor covering people, launches and day-to-day practice in Ocean and air freight, container shipping at Waybill Wire.

619 articles

Related05

  1. MSC Ajaccio skips Livorno, MSE imports rerouted via Barcelona

  2. Hapag-Lloyd Drops Genoa and Livorno Calls on MSW Loop

  3. Tarros reinstates direct Italy–Thessaloniki box service

  4. CMA CGM drops Leixões from MPS as revised Med rotation kicks in

  5. Gemini reshapes Asia-Med network, targets full Suez return by Q1

« Prev