WW/PORTSTERMI

Filed 722W4M read

Interferry Marks 50 Years in Bangkok as Grids Emerge as Ferry Decarbonization Bottleneck

Over 400 ferry executives in Bangkok heard Stena Line's CEO warn that multi-million-dollar electric fleets are stalling on inadequate shore power and local grid capacity.

By
James Calloway
Filed
Length
722 words
Read
4 min
Interferry2026: Global Ferry Leaders Convened in Bangkok for 50th Annual Conference
Interferry2026: Global Ferry Leaders Convened in Bangkok for 50th Annual ConferenceSmithsonian Institution / Smithsonian · CC0

Key points04

  • The 50th annual Interferry conference ran October 31 to November 4 in Bangkok with over 400 delegates.
  • Stena Line CEO Niclas Mårtensson said shipowners' multi-digit-million vessel investments require government-funded shore power networks.
  • Interferry's FerrySafe partnership with Lagos State Waterways Authority is delivering training and engine audits for millions of daily commuters.
  • Viking Line CEO Marcus Risberg takes over as president and will host Interferry2027 in Mariehamn, Åland Islands.

More than 400 ferry executives gathered on the banks of the Chao Phraya River in Bangkok from October 31 to November 4 for the 50th annual Interferry conference, and the hardest fact on the agenda was this: ferry operators are pouring multi-million-dollar sums into zero-emission vessels that local power grids cannot yet charge.

Delegates from major ferry groups, family-owned operators, and public transit authorities marked five decades since Interferry began as an informal operator meeting and grew into an international trade association. The agenda in Bangkok ran from decarbonization and seafarer recruitment to domestic ferry safety in developing economies and the economics of lifeline island services.

Who pays for shore power?

Decarbonization dominated the week. Shipowners keep investing in battery-electric ships, hybrid systems, and alternative-fuel vessels, but leaders warned that ports and local grids need matching investment if electric ferries are to charge between sailings.

Niclas Mårtensson, CEO of Stena Line, put the problem bluntly: "Ferry operators are committing massive multi-digit million capital investments directly into zero- and low-emission vessels, but shipowners cannot solve onshore infrastructure challenges. Achieving meaningful decarbonization requires true partnerships with and financial commitment by national governments and regional port authorities to build high-capacity shore power and charging networks."

Panos Dikaios, CEO of Greece's Attica Group, echoed the point. The switch to electric propulsion, he said, depends on whether local grids can supply enough power and whether government policy backs the required investment. For ferry groups, that means the pace of fleet electrification now hinges as much on utility regulators and port authorities as on shipyards.

Can ferries win the crewing war?

With the maritime industry facing a global shortage of qualified seafarers, a ferry leaders panel pitched the sector's advantages over deep-sea careers. Guido Grimaldi, corporate commercial director of the Grimaldi Group, said operators must sell those differences harder.

"Unlike deep-sea maritime careers that take crew away from home for months at a time, ferry shipping offers predictable rotation schedules, structured shoreside life, and a real balance between family and career," Grimaldi said. "We have to be far more proactive and explicit in demonstrating these career pathways to the next generation of maritime professionals."

Katy Taylor, CEO of Wightlink, framed the recruitment challenge as existential. "We are competing for talent in a completely altered job market," she said. "Adapting our culture, technology, and career growth structures to meet the expectations of Gen Z is not an optional human resources strategy - there simply is no other choice if we intend to remain operational."

What keeps lifeline services afloat?

Smaller operators described running island and remote-community routes where even a state-subsidized public service contract leaves costs to manage and revenue to earn. Onboard food sales bring in extra income, they said, while helping passengers through severe weather or family emergencies builds the community relationships that sustain the service.

FerrySafe's Lagos push

A dedicated session reviewed Interferry's FerrySafe initiative and its partnership with the Lagos State Waterways Authority (LASWA) in Nigeria. Akpan Ukeme Sunday, head of LASWA's Vessel Survey and Standards Department, said the program is already changing operations on the water.

"The structured technical training, mentorship, and engine system auditing provided through our partnership with Interferry is delivering immediate, practical changes on the water in Lagos," he said. "This direct transfer of expertise is actively building a safer, more resilient water transport network for millions of daily commuters."

New president, new venue

Outgoing Interferry president Supapan Pichaironarongsongkram, chairwoman of Chao Phraya Express Boat, handed the presidency to Marcus Risberg, CEO of Viking Line, whose company will host the 51st conference, Interferry2027, in Mariehamn in the Åland Islands.

"Moving from the metropolis of Bangkok to the small, maritime-steeped archipelago of the Åland Islands will certainly offer a distinct change of setting," Risberg said. "Yet the Åland Islands sits right at the geographic and operational heart of Baltic Sea shipping."

Interferry CEO Mike Corrigan closed on the association's record. "For fifty years, this association has proven that our industry accomplishes more when we work together," he said, adding that the conference "has shown that we are remarkably well-equipped for the next 50 years."

The industry reconvenes in Mariehamn in 2027, with shore power finance and crew recruitment still the open files.

Source: maritimeprofessional.com

Share this article:

More from James Calloway

James Calloway

Show full bio

Correspondent covering companies, deals and strategy in Ocean and air freight, container shipping at Waybill Wire.

921 articles

Related05

  1. Marmara Ferry Electrification Could Cut Emissions 63%, IMO Study Finds

  2. UK shore power faces redundancy as grid costs hit 25.1p/kWh

  3. EU shore power rules hit in 2030; grids need up to a decade

  4. Maritime Coalition Targets 20% Electrification of Shipping by 2035

  5. Electricity Must Power 35% of Shipping by 2035, Port Coalition Says

« Prev